Technical Reporting and Precision

Data is collected in less than 30 minutes of arriving on site using the safest of systems, allowing the flexibility to operate whilst the quarry is still producing, this can be achieved without stepping foot on site and with pilots operating from a safe area.

Information supplied within 30 Minutes:

Stockpile quantities & volumetric calculations specific to material to within 2%
30 million point precision mesh model < 50mm accuracy
3D navigable model of entire site
Orthomosaic image
Equipment imaging report
Environmental Near Infra Red Imagery (NIR) & report
Digital Elevation Models (DEM)
Digital Surface Models (DSM)
Digital Terain Models (DTM)
Technical stockpile report

GET A QUOTE